2. Checks & measurements
Add the drawing requirements, then record results here. Blank results stay pending.
Your first check starts here
Add a dimension with its permitted limits, or a manual check such as a thread gauge or visual inspection.
| # / Check | Requirements | Result | Status | Instrument & notes | Actions |
|---|
Check removed.
Reports are stored in this browser, on this device. Export a JSON backup to keep a portable copy. Print / PDF and HTML include the current report.